5.0 Stars - 500+ Reviews

Licensed & Insured

Fully licensed Texas contractor with comprehensive insurance coverage

20+ Years Experience

Two decades of excellence in Houston home remodeling

100% Satisfaction

We guarantee your complete satisfaction with our work

Visit Our Houston Showroom

Stop by our location to discuss your remodeling project in person. We're conveniently located in Houston and serve all surrounding areas.

Address

5328 Prudence Dr.
Houston, TX 77045

Hours

Mon-Fri: 8AM-8PM
Sat: 8AM-7PM
Sun: 10AM-6PM

Start Your Project Today

Contact Tell Projects for expert remodeling services in Houston. Free quotes, professional service, guaranteed results.

Get Free Quote (832) 572-5798
Partner With Us

Are You a Contractor? Join Our Network of Trusted Partners

Tell Projects is seeking experienced contractors and tradespeople for partnership opportunities on residential and commercial remodeling projects throughout the Houston area.

Steady Work Flow

Consistent project pipeline with guaranteed payment terms and clear timelines

Competitive Rates

Industry-leading compensation and performance bonuses for quality work

Professional Network

Join a team of skilled professionals and expand your business connections

Quality Projects

Work on high-end residential and commercial remodeling projects

500+
Projects Completed
$50M+
Total Project Value
20+
Years Experience
100%
Licensed & Insured

Requirements

  • Valid contractor license and insurance
  • Minimum 5 years experience in residential/commercial remodeling
  • Portfolio of completed projects
  • Professional references available
  • Reliable transportation and tools

Package Unit vs Split System Installation: Houston Commercial HVAC Guide | HVAC247PRO - Professional Quality Service | Tell Projects

Professional quality service for Houston, TX homeowners

Get Free Quote - (832) 572-5798

Package Unit vs Split System Installation: Houston Commercial HVAC Guide | HVAC247PRO

Updated 2025 Tell Projects Team 5 min read

Professional Current_live Services in Houston, TX

Looking for expert current_live in Houston, TX? Tell Projects provides comprehensive current_live services throughout the Houston area, including Houston, TX. With years of experience and a commitment to quality, we help homeowners transform their vision into reality.

Why Choose Tell Projects for Current_live

At Tell Projects, we understand that current_live requires careful planning, expert craftsmanship, and attention to detail. Our team of experienced professionals brings:

  • Over 10 years of experience in residential current_live
  • Licensed and insured contractors
  • Quality materials and workmanship
  • Competitive pricing and transparent quotes
  • Excellent customer service and communication

Our Current_live Process

We follow a proven process to ensure your current_live project exceeds expectations:

  1. Initial Consultation: We meet with you to discuss your goals, budget, and timeline
  2. Design & Planning: Our team creates detailed plans and 3D visualizations
  3. Material Selection: We help you choose the best materials for your needs and budget
  4. Professional Installation: Our skilled craftsmen complete the work with precision
  5. Final Inspection: We ensure everything meets our high quality standards

Cost Factors for Current_live in Houston, TX

The cost of current_live varies based on several factors:

  • Project scope and size
  • Materials and fixtures selected
  • Structural changes required
  • Timeline and scheduling
  • Permits and inspections

We provide detailed, itemized quotes so you understand exactly what you're paying for. Contact us today for a free consultation and estimate.

Popular Current_live Trends in Houston, TX

Houston-area homeowners are increasingly choosing modern, functional designs that enhance their home's value and comfort. Current trends include:

  • Energy-efficient solutions
  • Smart home integration
  • Open concept layouts
  • High-quality, durable materials
  • Custom features tailored to lifestyle

Benefits of Professional Current_live

Investing in professional current_live provides numerous benefits:

  • Increased Home Value: Quality current_live can significantly boost your property value
  • Enhanced Functionality: Better use of space and improved features
  • Long-Term Durability: Professional work lasts longer and requires less maintenance
  • Code Compliance: We ensure all work meets local building codes
  • Peace of Mind: Licensed, insured, and guaranteed workmanship

Service Areas

Tell Projects proudly serves Houston, TX and surrounding Houston-area communities including Katy, Sugar Land, The Woodlands, Cypress, Spring, Pearland, and beyond. No matter where you're located in Greater Houston, we're ready to help with your current_live project.

Get Started with Your Current_live Project

Ready to transform your space? Contact Tell Projects today for a free consultation. Call us at (832) 572-5798 or visit our showroom at 5328 Prudence Dr., Houston, TX 77045. We'll discuss your goals, provide expert recommendations, and create a detailed plan to bring your vision to life.

Tell Projects - Your trusted partner for quality current_live in Houston, TX and throughout Houston, TX.

HVAC247PRO Team January 2, 2025 8 min read

Commercial HVAC Systems: Choosing the Right Solution for Your Houston Business

When it comes to commercial HVAC installation in Houston, business owners face a critical decision: package unit vs split system installation. Both options offer distinct advantages for different commercial applications, and understanding these differences is crucial for making an informed investment that will serve your business for decades to come.

Houston's unique climate, characterized by hot, humid summers and mild winters, presents specific challenges for commercial HVAC systems. With temperatures regularly exceeding 95°F and humidity levels often above 70%, businesses need reliable cooling solutions that can handle the intense Texas heat while maintaining energy efficiency and indoor comfort.

Commercial HVAC installation in Houston, TX showing rooftop package unit and split system comparison
Commercial HVAC installation options in Houston's challenging climate

This comprehensive guide will help you understand the fundamental differences between package units and split systems, analyze cost implications for Houston businesses, evaluate energy efficiency considerations, and provide insights specific to the Houston commercial real estate market.

What is a Package Unit HVAC System?

A package unit is a self-contained HVAC system that houses all major components in a single outdoor unit. These systems are commonly installed on rooftops of commercial buildings and are particularly popular in Houston's commercial real estate market due to their space efficiency and straightforward installation process.

Package Unit Components

Package units integrate all essential HVAC components into one compact unit:

  • Compressor (the heart of the refrigeration cycle)
  • Condenser coil (rejects heat outdoors)
  • Evaporator coil (absorbs heat from indoor air)
  • Fan motors (both condenser and supply air)
  • Electrical controls and safety devices
  • Air filter section

Package Unit Advantages

Package units offer several benefits for Houston commercial properties:

  • Space Efficiency: All components in one unit saves valuable indoor space
  • Easier Installation: Single-unit installation reduces complexity
  • Simplified Maintenance: All components accessible from roof level
  • Lower Initial Cost: Generally 15-25% less expensive than split systems
  • Faster Installation: Typically completed in 1-3 days
  • Ideal for Retrofits: Perfect for buildings without existing ductwork

What is a Split System HVAC?

A split system HVAC divides components between indoor and outdoor units. The outdoor unit contains the compressor and condenser coil, while the indoor unit houses the evaporator coil, air handler, and often the furnace in heating climates. This configuration offers more flexibility in system design and operation.

Split System Components

Split systems require coordination between multiple components:

  • Outdoor Unit: Compressor and condenser coil
  • Indoor Unit: Evaporator coil and air handler
  • Ductwork System: Distribution network throughout the building
  • Thermostat: Control system for temperature regulation
  • Refrigerant Lines: Connect indoor and outdoor units

Split System Advantages

Split systems provide unique benefits for Houston commercial applications:

  • Higher Efficiency: Modern split systems achieve SEER ratings up to 22
  • Better Temperature Control: Zoning capabilities for different areas
  • Quieter Operation: Indoor unit operates at lower noise levels
  • Flexible Installation: Indoor unit can be placed strategically
  • Individual Room Control: Multi-zone systems for large facilities
  • Longer Lifespan: Typically last 15-20 years with proper maintenance

Need Expert HVAC Installation in Houston?

Get a free consultation and quote for your commercial HVAC system. Our certified technicians specialize in both package unit and split system installations.

Call (832) 555-1234

Package Unit vs Split System Installation Cost Comparison in Houston

Understanding the financial implications of your HVAC investment is crucial for Houston business owners. The cost difference between package units and split systems can significantly impact your bottom line, especially when considering long-term operational expenses.

Package Unit Installation Costs

Package unit installation in Houston typically ranges from $3,500 to $8,000 depending on system size and building complexity:

  • 10-ton unit: $3,500 - $5,000
  • 15-ton unit: $5,000 - $6,500
  • 20-ton unit: $6,500 - $8,000

Factors affecting package unit costs in Houston include:

  • Rooftop accessibility and structural requirements
  • Electrical upgrades for larger units
  • Ductwork modifications or installations
  • Permit and inspection fees
  • Building size and layout complexity

Split System Installation Costs

Split system installation costs are generally higher, ranging from $5,000 to $12,000:

  • 10-ton system: $5,000 - $7,500
  • 15-ton system: $7,500 - $9,500
  • 20-ton system: $9,500 - $12,000

Additional costs for split systems include:

  • Indoor air handler installation
  • Refrigerant line installation between units
  • More complex ductwork requirements
  • Longer installation timeline (3-5 days)
  • Higher labor costs due to complexity
HVAC installation cost comparison chart for Houston commercial buildings
Cost comparison between package unit and split system installations in Houston

Energy Efficiency Analysis: Package Unit vs Split System

Energy efficiency is a critical consideration for Houston businesses, where cooling costs can represent a significant portion of operational expenses. Understanding the efficiency differences between these systems can result in substantial savings over the system's lifespan.

SEER Ratings Comparison

Seasonal Energy Efficiency Ratio (SEER) measures cooling efficiency:

  • Package Units: 14-18 SEER (Energy Star minimum 14)
  • Split Systems: 16-22 SEER (High-efficiency models)

The higher efficiency of split systems translates to 10-20% lower energy consumption in most applications. For a typical Houston commercial building spending $3,000 monthly on cooling, this could mean annual savings of $3,600-$7,200.

Houston-Specific Efficiency Considerations

Houston's climate creates unique efficiency challenges:

  • High Humidity: Split systems with variable-speed compressors handle humidity better
  • Long Cooling Season: Efficiency differences compound over 8-9 months of use
  • Heat Island Effect: Urban buildings may benefit from split system zoning
  • Utility Rates: Houston's tiered electricity pricing rewards efficiency

Installation Process Differences

The installation process varies significantly between package units and split systems, affecting project timelines, disruption to business operations, and overall project management.

Package Unit Installation Process

Package unit installation in Houston typically follows this timeline:

  1. Site Assessment: Roof inspection and structural evaluation (1 day)
  2. Permit Acquisition: Municipal permits and utility coordination (2-3 days)
  3. Equipment Delivery: Crane or lift installation of unit (1 day)
  4. System Installation: Electrical, refrigerant, and duct connections (1-2 days)
  5. Testing and Commissioning: System startup and performance verification (1 day)

Split System Installation Process

Split system installation is more complex and time-intensive:

  1. Design Phase: Ductwork layout and system sizing (3-5 days)
  2. Indoor Unit Installation: Air handler placement and electrical work (1-2 days)
  3. Outdoor Unit Installation: Compressor placement and foundation (1 day)
  4. Ductwork Installation: Distribution system throughout building (2-4 days)
  5. Refrigerant Connection: Line installation and system charging (1 day)
  6. System Testing: Performance verification and balancing (1 day)

Houston Climate Considerations

Houston's subtropical climate presents specific challenges that influence HVAC system selection:

Temperature Extremes

Houston experiences:

  • Summer temperatures regularly exceeding 95°F
  • Over 100 days per year above 90°F
  • Winter temperatures rarely dropping below freezing
  • High humidity levels (60-80%) year-round

Impact on HVAC Selection

Climate factors affecting system choice:

  • Heat Rejection: Package units may struggle with heat rejection on extremely hot days
  • Humidity Control: Split systems with variable-speed technology excel at dehumidification
  • Corrosion Resistance: Coastal areas require corrosion-resistant materials
  • Storm Protection: Rooftop units need hurricane straps in hurricane-prone areas

Houston's Extreme Heat Damaging Your HVAC?

Don't wait for a breakdown during the hottest months. Schedule your preventive maintenance today.

Schedule Service Now

Maintenance Requirements Comparison

Proper maintenance is essential for both system types, but the approach differs significantly between package units and split systems.

Package Unit Maintenance

Package units offer maintenance advantages:

  • All components accessible from roof level
  • Faster service appointments (no indoor access needed)
  • Lower maintenance costs due to accessibility
  • Simpler troubleshooting with integrated components
  • Reduced risk of indoor property damage during service

Annual maintenance tasks include:

  • Coil cleaning (condenser and evaporator)
  • Fan motor inspection and lubrication
  • Refrigerant level verification
  • Electrical connection inspection
  • Filter replacement

Split System Maintenance

Split systems require more comprehensive maintenance:

  • Indoor and outdoor unit service required
  • Ductwork inspection and cleaning
  • Refrigerant line inspection
  • Indoor air quality assessment
  • Zoning system verification

Annual costs for split system maintenance typically run 20-30% higher than package units due to the complexity and time required for comprehensive service.

Frequently Asked Questions

What is the main difference between a package unit and a split system?

A package unit combines all HVAC components in one outdoor unit, while a split system separates components between indoor and outdoor units. Package units are typically installed on rooftops, while split systems require indoor air handlers.

Which is better for commercial buildings in Houston?

Both systems work well in Houston's climate. Package units are often preferred for their space efficiency and easier maintenance, while split systems offer more precise temperature control and quieter operation.

How much does package unit installation cost in Houston?

Package unit installation in Houston typically ranges from $3,500 to $8,000 depending on size, complexity, and building requirements. This is generally 15-25% less expensive than split system installation.

What are the energy efficiency differences?

Modern split systems typically offer higher SEER ratings (16-22) compared to package units (14-18). However, properly installed package units can achieve similar efficiency with proper maintenance.

How long does commercial HVAC installation take?

Package unit installation typically takes 1-3 days, while split system installation can take 3-5 days due to the complexity of indoor component installation and ductwork.

Do package units require more maintenance?

Package units are actually easier to maintain since all components are accessible from the roof. Split systems require maintenance of both indoor and outdoor units, increasing complexity.

Can I switch from package unit to split system later?

Yes, but it requires significant modifications including ductwork installation, electrical upgrades, and potentially structural changes. It's more cost-effective to choose the right system initially.

Visit Our Houston Showroom

Stop by our location to discuss your remodeling project in person. We're conveniently located in Houston and serve all surrounding areas.

Address

5328 Prudence Dr.
Houston, TX 77045

Hours

Mon-Fri: 8AM-8PM
Sat: 8AM-7PM
Sun: 10AM-6PM

Ready to Transform Your Home?

Contact Tell Projects today for a free consultation. Our expert team is ready to bring your vision to life!

What Our Customers Say

See why Houston homeowners trust Tell Projects for their remodeling needs